Initial Treatment
Check and adjust as needed, ph (7.2-7.6) and alkalinity (80-120 ppm) prior to application. Add 2 pounds per 10,000 gallons of pool water. Add directly to the pool with he pool circulation pump running. Pool may be used 15 minutes after application. Continuously circulate for 8 hours after application.
Maintenance Treatment:
Weekly, add 1 pound per 10,000 gallons of pool water. Add directly to the pool with the pool circulation pump running. Pool may be used 15 minutes after application. Continuously circular for 8 hours after application. Apply additional maintenance treatment doses when water look slightly hazy or dull. More frequent applications are needed if the pool is used heavily or frequently.