- When starting up a new pool, superchlorinate to satisfy the chlorine demand and establish a chlorine residual of 1.0-2.0 ppm available chlorine. To accomplish this, add 2 ounces of this product per 1,000 gallons of pool water.
- This product should be added daily or as needed at the rate of 1/4 to 1/2 ounce per 1,000 gallons of pool water to maintain a chlorine residual at all times of 1.0-2.0 ppm as determined by an accurate test kit. The pH should be maintained between 7.2 to 7.6.
- A shock treatment should be made every week during hot weather or after heavy rains. Less frequent shock treatments may be made during cool weather. To shock, add 2 ounces of this product per 1,000 gallons of pool water. Swimmers should not be permitted in the pool after the shock treatment until the chlorine residual has reached the 1.0 to 2.0 ppm range.
**Re-entry into the treated swimming pool is prohibited above levels of 3.0 ppm of chlorine**
Superchlorination Dose (Shock)
2 oz. per 1,000 gallons of pool water.
Maintenance Dose
1/4 to 1/2 oz. per 1,000 gallons daily or as needed.
Use this product to superchlorinate your pool at opening and shock treat your pool weekly to eliminate any waterborne contaminants that can endanger swimmers.